Home
Projects
Products
News
About
SHEQ
Jobs
Contact
PROJECTS
We pull the world!
KTC 500 > Troll A Phase III
Pipeline Pull in from Laybarge to Troll A Platform - Norway
CLI210 > Pipepull through drilled tunnel in Albania
Pull of 600 meter long pipestring through a drilled tunnel in the Albanian Mountains
C1100 > Baltic Pipline Estonia and Finland
Pipe pull operations at 2 locations, one pull in Finland near the town of Inkoo and the other landfall near the town of Tallinn in Estonia.
CLI 210 > Albania - Tap
This winch is rented for a maximum pull force of 100mton. The scope of work for this winch is: a river crossing. a pipeline will be pulled through a microtunnel.
KTC 800 > Turkstream
This winch is rented for a maximum pull force of 800 mtonnes.The scope of work for this winch is: Landfall of two pipelines
KTC800 SP > Nigeria
SSSGEPS Project Gaspipeline Pull from Offshore to Shore in the Niger Delta in Nigeria
KTC 500 > Ghana
Pull-in 26" Pipeline from Offshore to LTE location, with a max. pull force of 500mT
C1100 > Leviathan - Israel
Shore pull of 1x 32” Gas Pipeline with 2x 6” Condensate Pipeline bundle
C1100 HS > Gulf of Mexico
Our Winch Arr. 500 mT, placed on a Subframe on the Balder for Pulling in of Steel Catenary Risers (SCR’s)
C 1100 > Turkey - Tanap
Pipeline shore pull from Anatolion side and European side of Turkey wit a max. pull force of 500mT
KTC800 > Southstream
Pull in of two pipelines through a microtunnel Anapa Russia
KTC400 > Zohr Egypt
Pulling Arrangement with special Anchoring on sheet pile
C600 Piam Argentina
Pull of pipeline at night
CLI 210 > Azerbaijan & Georgia
Pull-in a 48” pipeline +/- 1000 meter river crossing, through a microtunnel.
KTC 400 > Turkmenistan
Landfall Project of gas pipeline to gas treatment plant
KTC 800 SP > Elbeducker
Pipeline Recovery pulled 1500 mton
CLI 210 > Denmark
Pull-in of 2 riser caissons on Roar & Valdemar platforms
KTI 150 > Myanmar - Yetagun
KTI 150 linear winch spread used for chain replacement of FPSO
CPM 1100 > Republic of Congo
Landfall of pipeline on Moho Nord Field, offshore Congo, in water depths between 800 and 1050 meter.
80mT Hydr.Drum W.> Rheinberg
Our 80mT Hydraulic Drum Winch was used for, pull of gasline for Hülskens Wasserbau
CPM 1100 > Argentina
Pull-in of pipeline - Vega Pleyade Project - Argentina
CLI 210 > Harderwijk
A 150 year old oak is relocated with the use of our linear winch.
KTC 500 > Norway
For the pull-in of the 36” pipeline section the KTC 500 was used.
BI 300 > Benin, West Africa
Pull-in of 3 pipelines with BI 300 linear winch spread.
KTC 800 > Wheatstone Gas & Oil Project, Australia
Pull-in of 3000 meter pipeline for the Chevron Wheatstone Project with an 800 Mton linear winch from the Bezemer Rental Fleet.
CPM 1100 > Brazil
Second Phase of Nordeste Landfall project.
KTC 500 > Venezuela
For this project the KTC 500 linear winch with auxiliary equipment was used.
80T Drum Winch > CMMP
Six of our Hydraulic Single Drum Winches were used.
CLI 210 > Ivory Coast
The small dimensions and low weight made it the best solution for this project.
CLI 210 > Greece
The CLI 210 was used for a reversed beach pull.
KTC 400 > Saudi Arabia
In total 3 pipelines were pulled in 2 dredged trenches.
C1100 HS > Brazil
First phase of the Nordeste Landfall Project.
C600 > Vinaros, Spain
Mobilization by road possible due to reasonable light equipment.
KTC 500 > Visund Sør_Tordis - Norway
Several Pipe pulls for Riser Replacements
KTC 400 > Iraq
Safety of operators and equipment was the main challenge.
CPM 1100 > Papua New Guinea
The CPM 1100 was used for the pull, which included a socket passing.
KTC 800 > Offshore near Okha, India
A part of a total of 850 mton of equipment that was shipped to India.
KTC 400 > Huelva, Spain
The KTC 400 was used for a straight forward pull in Huelva, Spain.
C1100 HS > Lybia
Our client prepared a pull barge for which we supplied the holdback system on the barge.
KTC 500 > Troll A, Norway
Bezemer had been contacted by Aibel who was acting as engineering company for Statoil, ...
C1100 > Baltic Europipe II
Pipe Pull Winch Spread with a max. Pull force of 500mTon,
KTC500 > Lillebaelt
Pipe Pull and Wire-Lay Winch Spread with a max. Pull force of 500mTon,
CPM1100 > Zohr II Egypt
Beach Pull of 4 Pipelines with CPM1100 max. Pull force of 500 Mton
KTC400 > EPPLN - France
Barge Pipe-Pull 2600m from shore into the sea max. Pull-Force of 500mTon
CPM1100 > Sakhalin
Pipeline Installation / Crossing with our CPM1100 witn a max pull-force of 400mTon
KTC400 > Italy / Albania
Landfalls Pipe -pull between Albania and Italy with a max. pull force of 500mton.
KTC800 > Germany
Arge Eugel Los 7 +8 Project Pull back Pipe Line with max. 750T Pull Force
CLI210S > Congo
Releasing of chain Anchors of the Conkouati FPSO with our CLI210S with a max. Pull force of 100 mTon
C600 > Elbe Ducker
Pipepull with our C600 with a max Pull-force of 300 mTon, Eugal Elbeducker Brückwitz-Gauermitz
80T Winch - Biesbosch
Pulling of 3 DN2100 Pipelines from Water intake station to Reservoir Biesbosch
KTC800 - Baltic Poland
This Winch is rented for a Pipeline Landfall with a max. Pull-Force of 800T
C600 - Silivri - Istanbul
This Winch is rented for a Pipeline Landfall with a max. Pull-Force of 300T
Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e:
info@bezemer.com
Follow us:
Latest tweet
@bezemergroup