Projects

Bezemer Goup B.V., has been involved in a wide range of projects around the world. Our portfolio represents a history of diverse and impactful projects, from working on challenging topside installations to beach pulls in harsh environments. 

Over the years, our team has successfully contributed to various offshore and onshore initiatives. We have played a role in the installation of offshore platforms, the laying of extensive pipelines, replacements and other remarkable projects. These projects have allowed us to demonstrate our expertise and showcase our ability to overcome obstacles with ingenuity and precision. 

At Bezemer Dordrecht, we are proud of this diverse range of projects we pulled off.  Please read our project stories to learn more about how we deploy our equipment. 

Pulling Through Tunnels

Pulling To Improve Infrastructure

Pulling On Platforms

Pulling For Floatovers

Reference Projects

Baltic Pipe Lillebaelt Crossing Denmark   500 Ton Linear Winch KTC 500 | Bezemer Group

A 500 mtonnes pipepull and wire-Lay in Lillebealt using a specially engineered sheave.

Read more

Arge Eugen Project Germany 800 ton linear winch KTC 800

Pullback operation to retrieve the EUGAL drillhead in the german woods.

Read more

Tap Project Albania 100 Ton Linear Winch CLI 210

Bezemer completed various pipe pulls for the tap project, which is part of the new Southern Gas Corridor.

Read more

Big Foot Project Gulf of Mexico  500 Ton Linear Winch C1100 HS | Bezemer Group

Pulling in of Steel Catenary Risers using a 500 mtonnes winch on a subframe.

Read more

1 2 3 4