Project description
Due to rearrangement of the station area in Harderwijk, a 150 year old oak had to move 60 meters from its original location.
A trench of approximately 100 meter was excavated to its final destination where it will be set as an eye catcher next to the entrance of a new tunnel.
Upon request of BSI Bomenservice B.V. we supplied a 100 mton Linear Winch including snatch block, hydraulic power unit and generator set.
With the use of the snatch block we were able to relocate the oak with a final pull tension of 130 mton.