Brazil – Nordeste Landfall Project (phase II) – CPM 1100
Used Products in this project
Brazil – Nordeste Landfall Project (phase II) – CPM 1100
Project description
For the second phase of the Nordeste Landfall project, our client outfitted a pull barge, for which we supplied the pull-in equipment and back anchoring system of the winch.
The barge was towed to location in Brasil and the 3 sections were pulled from the beach until the already installed pipeline Tie-in location. Also a section of the pipe line was pulled over a sandbank which could not be reached by the laybarge.