Nordeste Landfall Project Phase II Brazil
500 ton linear winch CPM 1100
Used Products in this project
Nordeste Landfall Project Phase II Brazil
500 ton linear winch CPM 1100
Project description
For the second phase of the Nordeste Landfall project, our client outfitted a pull barge, for which we supplied the pull-in equipment and back anchoring system of the winch.
The barge was towed to location in Brasil and the 3 sections were pulled from the beach until the already installed pipeline Tie-in location. Also a section of the pipe line was pulled over a sandbank which could not be reached by the laybarge.