AAP-project-500-ton-linear-winch

Immersion Scheldt Tunnel for Oosterweel Project Completed

Over the course of July 2025 until December 2025 our winch operators have been busy on the beautiful river Scheldt in Antwerp – operating our winches to position the eight 160meter tunnel elements of the new Scheldt Tunnel.

Click here to read more about Bezemers contribution and watch the photo gallery.