Client Aftermovie Project Scheldt Tunnel

Our client Immontec, shared their aftermovie of the immersion of the 8th tunnel element of the Scheldt Tunnel. In this video they look back with images from the quay and the water that show the immersion operation up close. During 2025 Bezemer was involved in this project and provided drum winches, and operational support.

Watch the video, or click here to read more about our contribution to this project.