Turkmenistan – Caspian Turkmenistan Project – KTC 400

  • Client

    ILK Construction Contracting & Trade Inc.

  • Location

    Turkmenbashy, Turkmenistan

Used Products in this project

Turkmenistan – Caspian Turkmenistan Project – KTC 400

Project description

The scope of work for the KTC 400 continuous linear winch is the installation of a 3000 meters long, 14″OD, 12.7mm. thick, 90mm. concrete coated steel landfall pipeline in the Caspian Sea – Turkmenistan.

This winch is rented for a maximum pull force of 350 mton.