Landfall Project of gas pipeline to gas treatment plant.
Pull-in of 2 riser caissons on Roar & Valdemar platforms.
Deep water landfall operation (depths 800 and 1050 meter).
The delicate relocation of a-150-year old oak in Harderwijk.
Safety of operators and equipment was the main challenge.
Pipepull including a socket passing with the CPM 1100 which .
A part of 850 mtonnes of equipment that was shipped to India.
Assisting Aibel, the engineering company for Statoil.
300 mtonnes pipepull landfall in Istanbul.