Projects

Baleine Project Installation linear winch equipment

Installation of a gas pipeline trough a micro tunnel.

Read more

Project Tunnel Pull Albania 100 ton linear winch CLI 210

Pipepull through a drilled tunnel in the Albanian Mountains.

Read more

Baltic pipeline Estonia Finland 500 ton linear winch C1100

Pipepull operations at 2 locations.

Read more

Troll Phase 3 Project Norway 500 ton linear winch KTC 500

Pipeline Pull in from Laybarge to Troll A Platform – Norway.

Read more

turkstream-project-turkey-linear-winch-ktc-800

800 mtonnes Turkstream pipepull.

Read more

SSSGEPS-Project-Nigeria-linear-winch-ktc-800sp

Gaspipeline Pull in the Niger Delta in Nigeria.

Read more

OCTP-gas-Export-Sealine-Project-ghana-linear-winch-ktc-500

Pull-in 26″ Pipeline from Offshore.

Read more

leviathan-project-israel-500-ton-linear-winch-c1100

Gas Pipeline shore pull with condensate pipeline bundle.

Read more

Pulling in of SCR’s via 500 mtonnes winch on subframe.

Read more

500 mtonnes pipeline shore pull.

Read more

Pipepull of Southstream pipelines through a microtunnel.

Read more

Pulling Arrangement with special Anchoring on sheet pile.

Read more

Pull of pipeline at night.

Read more

1000 meter river crossing, through a microtunnel.

Read more

Landfall Project of gas pipeline to gas treatment plant.

Read more

Pipeline Recovery pulled 1500 mtonnes.

Read more

Pull-in of 2 riser caissons on Roar & Valdemar platforms.

Read more

Linear winch spread used for chain replacement of FPSO.

Read more

Deep water landfall operation (depths 800 and 1050 meter).

Read more

80mT Hydraulic Drum Winch gasline pull.

Read more

Pull-in of pipeline  for the Vega Pleyade Project.

Read more

The delicate relocation of a-150-year old oak in Harderwijk.

Read more

The pull-in of the 36” pipeline section.

Read more

Pull-in of 3 pipelines with BI 300 linear winch spread.

Read more

800 mtonnes pipe pull of 3000 meter pipeline.

Read more

Second Phase of Nordeste Landfall project.

Read more

The deployment of the KTC 500 linear.

Read more

Drum_Winch

Six of our Hydraulic Single Drum Winches were used.

Read more

Small dimensions and low weight solution.

Read more

Reversed beach pull.

Read more

Pipelines pull (3) in trenches.

Read more

First phase of the Nordeste Landfall Project.

Read more

Road mobilisation made possible due to ‘light’ equipment.

Read more

Several Pipe pulls for Riser Replacements.

Read more

Safety of operators and equipment was the main challenge.

Read more

Pipepull including a socket passing with the CPM 1100 which .

Read more

A part of 850 mtonnes of equipment that was shipped to India.

Read more

The KTC 400 was used for a straight forward pull in Huelva.

Read more

Holdback system for a barge.

Read more

Assisting Aibel, the engineering company for Statoil.

Read more

500 mtonnes pipepull for Baltic Europipe II.

Read more

500 mtonnes pipepull and wire-Lay in Lillebealt.

Beach Pull of 4 pipelines with the CPM 1100.

Read more

500 mtonnes barge pipepull 2600m from shore into the sea.

Read more

Pipeline Installation / Crossing with CPM1100 in Sakhalin.

Read more

500 mtonnes pipepull between Albania and Italy.

Read more

Arge Eugel pull back operation with 750 mtonnes force.

Read more

Chain Anchors releasing of the Conkouati FPSO.

Read more

300 mtonnes pipepull at, Eugal Elbeducker Brückwitz-Gauermitz.

Read more

Pulling of 3 DN2100 pipelines from water intake station.

Read more

Pipeline landfall with a pull-force of 800 mtonnes.

Read more

300 mtonnes pipepull landfall in Istanbul.

Read more

Tap Project Albania 100 Ton Linear Winch CLI 210

Pipepull through a microtunnel.

Read more