Leading global winch experts
Pipeline Pull in from Laybarge to Troll A Platform – Norway.
Read more
Pipepull through a drilled tunnel in the Albanian Mountains.
Pipepull operations at 2 locations.
Pipepull through a microtunnel.
800 mtonnes Turkstream pipepull.
Gaspipeline Pull in the Niger Delta in Nigeria.
Pull-in 26″ Pipeline from Offshore.
Gas Pipeline shore pull with condensate pipeline bundle.
Pulling in of SCR’s via 500 mtonnes winch on subframe.
500 mtonnes pipeline shore pull.
Pipepull of Southstream pipelines through a microtunnel.
Pulling Arrangement with special Anchoring on sheet pile.
Pull of pipeline at night.
1000 meter river crossing, through a microtunnel.
Landfall Project of gas pipeline to gas treatment plant.
Pipeline Recovery pulled 1500 mtonnes.
Pull-in of 2 riser caissons on Roar & Valdemar platforms.
Linear winch spread used for chain replacement of FPSO.
Deep water landfall operation (depths 800 and 1050 meter).
80mT Hydraulic Drum Winch gasline pull.
Pull-in of pipeline for the Vega Pleyade Project.
The delicate relocation of a-150-year old oak in Harderwijk.
The pull-in of the 36” pipeline section.
Pull-in of 3 pipelines with BI 300 linear winch spread.
800 mtonnes pipe pull of 3000 meter pipeline.
Second Phase of Nordeste Landfall project.
The deployment of the KTC 500 linear.
Six of our Hydraulic Single Drum Winches were used.
Small dimensions and low weight solution.
Reversed beach pull.
Pipelines pull (3) in trenches.
First phase of the Nordeste Landfall Project.
Road mobilisation made possible due to ‘light’ equipment.
Several Pipe pulls for Riser Replacements.
Safety of operators and equipment was the main challenge.
Pipepull including a socket passing with the CPM 1100 which .
A part of 850 mtonnes of equipment that was shipped to India.
The KTC 400 was used for a straight forward pull in Huelva.
Holdback system for a barge.
Assisting Aibel, the engineering company for Statoil.
500 mtonnes pipepull for Baltic Europipe II.
500 mtonnes pipepull and wire-Lay in Lillebealt.
Beach Pull of 4 pipelines with the CPM 1100.
500 mtonnes barge pipepull 2600m from shore into the sea.
Pipeline Installation / Crossing with CPM1100 in Sakhalin.
500 mtonnes pipepull between Albania and Italy.
Arge Eugel pull back operation with 750 mtonnes force.
Chain Anchors releasing of the Conkouati FPSO.
300 mtonnes pipepull at, Eugal Elbeducker Brückwitz-Gauermitz.
Pulling of 3 DN2100 pipelines from water intake station.
Pipeline landfall with a pull-force of 800 mtonnes.
300 mtonnes pipepull landfall in Istanbul.
Automated page speed optimizations for fast site performance