Projects

, Projects

Pipeline Pull in from Laybarge to Troll A Platform – Norway.

Read more

, Projects

Pipepull through a drilled tunnel in the Albanian Mountains.

Read more

, Projects

Pipepull operations at 2 locations.

Read more

, Projects

Pipepull through a microtunnel.

Read more

, Projects

800 mtonnes Turkstream pipepull.

Read more

, Projects

Gaspipeline Pull in the Niger Delta in Nigeria.

Read more

, Projects

Pull-in 26″ Pipeline from Offshore.

Read more

, Projects

Gas Pipeline shore pull with condensate pipeline bundle.

Read more

, Projects

Pulling in of SCR’s via 500 mtonnes winch on subframe.

Read more

, Projects

500 mtonnes pipeline shore pull.

Read more

, Projects

Pipepull of Southstream pipelines through a microtunnel.

Read more

, Projects

Pulling Arrangement with special Anchoring on sheet pile.

Read more

, Projects

Pull of pipeline at night.

Read more

, Projects

1000 meter river crossing, through a microtunnel.

Read more

, Projects

Landfall Project of gas pipeline to gas treatment plant.

Read more

, Projects

Pipeline Recovery pulled 1500 mtonnes.

Read more

, Projects

Pull-in of 2 riser caissons on Roar & Valdemar platforms.

Read more

, Projects

Linear winch spread used for chain replacement of FPSO.

Read more

, Projects

Deep water landfall operation (depths 800 and 1050 meter).

Read more

, Projects

80mT Hydraulic Drum Winch gasline pull.

Read more

, Projects

Pull-in of pipeline  for the Vega Pleyade Project.

Read more

, Projects

The delicate relocation of a-150-year old oak in Harderwijk.

Read more

, Projects

The pull-in of the 36” pipeline section.

Read more

, Projects

Pull-in of 3 pipelines with BI 300 linear winch spread.

Read more

, Projects

800 mtonnes pipe pull of 3000 meter pipeline.

Read more

, Projects

Second Phase of Nordeste Landfall project.

Read more

, Projects

The deployment of the KTC 500 linear.

Read more

Drum_Winch

Six of our Hydraulic Single Drum Winches were used.

Read more

, Projects

Small dimensions and low weight solution.

Read more

, Projects

Reversed beach pull.

Read more

, Projects

Pipelines pull (3) in trenches.

Read more

, Projects

First phase of the Nordeste Landfall Project.

Read more

, Projects

Road mobilisation made possible due to ‘light’ equipment.

Read more

, Projects

Several Pipe pulls for Riser Replacements.

Read more

, Projects

Safety of operators and equipment was the main challenge.

Read more

, Projects

Pipepull including a socket passing with the CPM 1100 which .

Read more

, Projects

A part of 850 mtonnes of equipment that was shipped to India.

Read more

, Projects

The KTC 400 was used for a straight forward pull in Huelva.

Read more

, Projects

Holdback system for a barge.

Read more

, Projects

Assisting Aibel, the engineering company for Statoil.

Read more

, Projects

500 mtonnes pipepull for Baltic Europipe II.

Read more

, Projects

500 mtonnes pipepull and wire-Lay in Lillebealt.

, Projects

Beach Pull of 4 pipelines with the CPM 1100.

Read more

, Projects

500 mtonnes barge pipepull 2600m from shore into the sea.

Read more

, Projects

Pipeline Installation / Crossing with CPM1100 in Sakhalin.

Read more

, Projects

500 mtonnes pipepull between Albania and Italy.

Read more

, Projects

Arge Eugel pull back operation with 750 mtonnes force.

Read more

, Projects

Chain Anchors releasing of the Conkouati FPSO.

Read more

, Projects

300 mtonnes pipepull at, Eugal Elbeducker Brückwitz-Gauermitz.

Read more

, Projects

Pulling of 3 DN2100 pipelines from water intake station.

Read more

, Projects

Pipeline landfall with a pull-force of 800 mtonnes.

Read more

, Projects

300 mtonnes pipepull landfall in Istanbul.

Read more