Tunnel Pull Albania
100 ton linear winch CLI 210
Used Products in this project
Tunnel Pull Albania
100 ton linear winch CLI 210
Project description
Pull of pipe strings through a drilled tunnel in the Albania Mountains. Due to the Covid-19 epidemic, it was not possible to send our operators to this job, and we have trained 2 of our clients personnel to operate the Linear Winch. The job was successfully completed without any delays or problems. Afterwards, our equipment was returned to our yard in the Netherlands.