South Stream Project Russia
800 ton linear winch KTC 800

  • Client

    Van Oord Offshore B.V.

  • Location

    Anapa Russia

Used Products in this project

South Stream Project Russia
800 ton linear winch KTC 800

Project description

The South Stream Project required two pipelines to be pulled through a microtunnel. For this project, the KTC800 Linear Winch is rented for a maximum pull force of 800 mtonnes.