Nordeste Landfall Project Phase I Brazil
500 ton linear winch C1100 HS
Used Products in this project
Nordeste Landfall Project Phase I Brazil
500 ton linear winch C1100 HS
Project description
For the first phase of the Nordeste Landfall Project the C1100 HS linear winch together with 3 sections of wires, to execute 3 pulls of approx. 2800m length were mobilised. In this phase of the project, the pipeline sections were pulled from the lay barge until approx. 1800 meters from shore. The pull wire was disconnected and the pipeline section was abandoned until the tie-in with the shore section.