Nordeste Landfall Project Phase I Brazil
500 ton linear winch C1100 HS

  • Client

    Boskalis Offshore B.V.

  • Location

    Brazil

Used Products in this project

Linear winch type C1100 HS

Nordeste Landfall Project Phase I Brazil
500 ton linear winch C1100 HS

Project description

For the first phase of the Nordeste Landfall Project the C1100 HS linear winch together with 3 sections of wires, to execute 3 pulls of approx. 2800m length were mobilised. In this phase of the project, the pipeline sections were pulled from the lay barge until approx. 1800 meters from shore. The pull wire was disconnected and the pipeline section was abandoned until the tie-in with the shore section.