Albania – Tunnel Pull – CLI 210

  • Client

    Spiecapag

  • Location

    Albania

Used Products in this project

Albania – Tunnel Pull – CLI 210

Project description

Pull of pipe strings through a drilled tunnel in the Albania Mountains. Due to the Covid-19 epidemic, it was not possible to send our operators to this job, and we have trained 2 of our clients personnel to operate the Linear Winch. The job was successfully completed without any delays or problems. Afterwards, our equipment was returned to our yard in the Netherlands.