SSSGEPS Project Nigeria
800 ton linear winch KTC 800 SP
Used Products in this project
SSSGEPS Project Nigeria
800 ton linear winch KTC 800 SP
Project description
Supply of an 800 Mton Linear winch spread for the pull of a gas pipeline from offshore to shore in the Niger Delta in Nigeria. A challenging job due to its location and climate. The pull was over a long section of shallow water which made the installtion of the pull wires a complicated operation which worked out fine at the end. We have used dyneema lines in sections to pull the pull wire from the barge to the shore.