Russia – South Stream Project – KTC 800
Used Products in this project
Russia – South Stream Project – KTC 800
Project description
The South Stream Project required two pipelines to be pulled through a microtunnel. For this project, the KTC800 Linear Winch is rented for a maximum pull force of 800 mtonnes.