Egypt – Zohr Project- KTC 400
Used Products in this project
Egypt – Zohr Project- KTC 400
Project description
This pull of one 8″ Glycol Line, one 14″ Service Line and one 26″ Gas Line is done by our Linear Winch KTC400. This winch-type was used to landfall three pipelines with a max. pulling force of 500 mton and a steel wire rope Ø 102mm.