Castor Project Spain
300 ton linear winch C600
Used Products in this project
Castor Project Spain
300 ton linear winch C600
Project description
For this project the C600 linear winch was rented by Tideway in The Netherlands. The winch was used to pull-in a gas pipeline through a drilled tunnel from the lay barge.
The wire was pulled out with a spud pile pontoon to a location where it was picked up by the lay barge S355, operated and owned by Saipem.
The equipment for this project was mobilized by road, this was possible since the C600 spread is reasonable light equipment.