Project description
The scope of work for this project consisted of 3 pipe pulls (shore pulls). The carbon steel pipes were installed from the shoreline down to a maximum depth of 30m, utilizing the S-lay system of the GEOCEAN PROTIS. One power cable wasrun along each 15km long pipe.