Benin Project West Africa
300 ton linear winch BI 300
Used Products in this project
Benin Project West Africa
300 ton linear winch BI 300
Project description
The scope of work for this project consisted of 3 pipe pulls (shore pulls). The carbon steel pipes were installed from the shoreline down to a maximum depth of 30m, utilizing the S-lay system of the GEOCEAN PROTIS. One power cable wasrun along each 15km long pipe.