HO 2019-006 - Tunnel pull Albania

Client: Spiecapag
Location: Albania
Project description

Pull of pipestrings through a drilled tunnel in the Albania Mountains. Due to the Covid-19 epidemic it was not possible to sent our operators to this job, and we have trained 2 of our clients personel to operate the Linear Winch. The job was successfully completed without any delays or problems and equipment was returned to our yard in the Netherlands.
Used products in this project

Intermittent linear winch CLI 210 S

Linear winch type CLI 210


  • Preparation of Pull wire
  • inserting pipe section of 12  meter in tunnel
  • Pipe section installed in entrance shaft
  • Linear winch in exit shaft
  • Pipepull completed

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup