HO 2018-011 - Troll Phase 3 - KTC500

Client: Aker Solutions AS
Location: Troll A - Norwegian continental shelf
Project description

Pull in Pipeline into Troll A Platform from pipelay vessel and the installation of the pull wire from vessel to platform. All equipment was according to Norsok Z-015 and EX rated. 
Used products in this project

Continuous linear winch KTC 500

Linear winch type KTC 500


  • Installation on Canopy deck
  • Dismantling equipment
  • Canopy deck
  • Canopy deck 1
  • troll-platform-72
  • Installation winch on truck1
  • Puu;l wire recovery