Home
Projects
Products
News
About
SHEQ
Jobs
Contact
« to project overview
HO 2015-004 - Elbedüker - KTC800SP
Client:
Hulskens Wasserbau GmbH & Co. KG
Location:
West of Hamburg, Germany
Project description
The KTC 800 SP (socket passing) was used for a pipeline recovery as part of the Elbedüker project in Germany. With the use of a 1600 mton sheave, a pull of 1500 mton, three (3) pipelines, 1100 meters, were pulled simultaneously.
Used products in this project
Linear Winch type KTC 800 SP
80T Winch
Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e:
info@bezemer.com
Follow us:
Latest tweet
@bezemergroup