HO 2019-008 - Biesbosch - 80T H.Winch

Client: Denys NV. Belgium
Location: Biesbosch - Bergsche Maas
Project description

Pulling of 3 DN2100 Pipelines from a new Water intake station build at the Bergsche Maas to the Gijster Water Reservoir in the Biesbosch with Contractor Evides and Subcontractor Denys


Pulling with 3 of our 80T H. Drum Winches with Powerpacks and Anchoring with our RB90 Drum Winch

Used products in this project

80T Single Drum Winch overview

80T Winch


  • PWDQ2815
  • VLXJ8237
  • IMG_1530
  • IMG_1535
  • TPDA1389
  • THCV1639

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup