HO 2016-004 - Azerbaijan + Georgia - CLI 210

Client: CSM Bessac
Location: Azerbaijan & Georgia
Project description

This winch is rented for a maximum pull force of 100mton.


The scope of work for this winch is: a 48” pipeline will be pulled through a microtunnel with +/- 1000 meter river crossing. 

Used products in this project

Intermittent linear winch CLI 210 S

Linear winch type CLI 210


  • IMG_2595 4-3
  • IMG_2597 4-3
  • IMG_2538 4-3s
  • IMG_2563 4-3
  • IMG_2515 4-3
  • IMG_2531 4-3
  • IMG_2537 4-3
  • CLI210 in Tunnel 4-3

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup