For the Moho Nord Field Project our pipeline pulling assistance was required.


Geocean's complete project included the preparation of an onshore pulling site, the construction of a gravity anchor as well as the installation of our 500mton linear winch spread, to pull the 16" steel pipeline over approximately 2,5 km.


The challenge on this project was operating within a narrow space without interferring the activities of the Djeno Terminal.

Used products in this project

Continuous linear winch CPM 1100

Linear winch type CPM 1100


  • Topview site layout
  • Layout winch looking seawards
  • Site layout
  • 4x 750 meter, 102mm wire rope
  • Storage winches lined up
  • Rollers supporting wire rope
  • Buoyance on pipeline
  • Pipe laying vessel
  • DSC06034 (Large)
  • DSC06040 (Large)
  • Wire supported by wire rollers