Vega Pleyade Project - Tierra del Fuego - Argentina - CPM 1100

Client: Boskalis / Atlantique Dragage S.A.R.L.
Location: Argentina
Project description

The Vega Pleyade Project concerns a gas field located in the South of Argentina.


This area is rich in gas fields. The Vega Pleyade field was developed with 1 platform.


From our large range of linear winches Bezemer supplied the CPM 1100 linear winch for this project, with a maximum pull force of 500 mTon.


The scope of work for the project was the pull-in of a pipeline to shore.


Due to severe weather conditions that often occur in this part of the world it's always a challenge to fulfil the job.

Used products in this project

Continuous linear winch CPM 1100

Linear winch type CPM 1100


  • CPM 1100 winch on transport
  • CPM 1100 winch spread 01
  • CPM 1100 winch spread 02
  • CPM 1100 winch spread 03
  • Location Argentina
  • Middle of nowhere
  • Transport of CPM 1100
  • Vega Pleyade Argentina
  • View of pipe laying vessel
  • Wire view