BEZEMER GROUP - WORLDWIDE
2013 / 2014 - Benin Project - West Africa.
The scope of work for this project consisted of 3 pipe pulls (shore pulls). The carbon steel pipes will be installed from the shore line down to a maximum depth of 30m, utilizing the S-lay system of the GEOCEAN PROTIS. One power cable will be run along a 15km length of pipe.