Wheatstone, Australia - KTC 800

Client: Tideway B.V.
Location: Near Onslow, Australia
Project description

Pull-in of pipeline through concrete tunnel in Northern Australia 
Used products in this project

Continuous linear winch KTC 800

Linear winch type KTC 800


  • KTC 800 winch spread
  • Arial photo Wheatstone plant
  • Container lifted onto support vessel
  • KTC 800 winch spread
  • Holdback arrangement
  • Lifting reel on laybarge Togmor
  • Lifting reel with 245 Mton of Pull wire
  • Lifting winch onto winch foundation
  • Operator operating winch
  • Pipe pulled through concrete tunnel
  • Reels with 1500 mtr. 128mm. wire
  • Section A of KTC 800 on transport
  • Storage winches on transport