Ivory Coast Project

Client: Geocean S.A.
Location: Ivory Coast
Project description

In May 2013 Geocean has completed the prefabrication, installation and precommissioning of 1x14" and 1x16" pipelines, 850m long each, at Addah (Ivory Coast).


Installation has been performed by pulling the pipes from shore using an intermittent pulling winch, 12 mTon Stevshark anchor and 2400 meter of 52mm. steel wire. 


For this project Bezemer supplied the linear winch, wires, sheaves, etc.


The winch used, was an intermittent linear winch, type CLI 210. The small dimensions and low weight made it the best solution for this project.

Used products in this project

Intermittent linear winch CLI 210 S

Linear winch type CLI 210


  • HO 2012-011 pic 01
  • HO 2012-011 pic 02
  • HO 2012-011 pic 03
  • HO 2012-011 pic 04
  • HO 2012-011 pic 05
  • HO 2012-011 pic 06
  • HO 2012-011 pic 07

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup