On board of the Saipem 'Crawler' Bezemer installed a 100 mton linear winch spread for the installation of the offshore section of a new High Pressure Natural Gas Transmission Pipeline.
The 20’’ diameter pipeline with a length of approximately 72 km. is installed to transport gas from the line valve station, located at the main transmission Pipeline of DESFA at Stefani, to the power plant of Aliveri (Evia, Central Greece).