Nordeste Landfall Project (phase I)

Client: Boskalis Offshore B.V.
Location: Brazil
Project description

For the first phase of the Nordeste Landfall Project the C1100 HS linear winch together with 3 sections of wires, to execute 3 pulls of approx. 2800m length were mobilised. In this phase of the project the pipeline sections were pulled from the lay barge until approx. 1800 meters  from shore. The pull wire was disconnected and the pipeline section abandoned until the tie-in with the shore section. 
Used products in this project

Continuous linear winch C1100 @Brazil

Linear winch type C1100 HS


  • C1100 HS Linear Winch Spread 01
  • C1100 HS Linear Winch Spread 02
  • C1100 HS Linear Winch Spread 03
  • C1100 HS Linear Winch Spread 04
  • C1100 HS Linear Winch Spread 05
  • C1100 HS Linear Winch Spread 06
  • C1100 HS Linear Winch Spread 07
  • C1100 HS Linear Winch Spread 08
  • C1100 HS Linear Winch Spread 09