PNG LNG EPC2 Offshore Pipeline Project

Client: Saipem Singapore Pte. Ltd.
Location: Papua New Guinea
Project description

For this project the CPM 1100 linear winch, complete with all wires, reels, holdback system etc. was prepared for our customer Saipem Singapore.


The challenge of this project was the transport of the equipment to Papua New Guinea. It was not possible to ship the equipment directly to site, therefore a stop in Singapore was required. There all the equipment was offloaded and loaded onto another vessel for final transport to Port Moresby, which is close to the landfall site.


The pipeline was a 34” diameter, 1800 meter long section gas line pulled from Saipem's pipelay barge “Semac 1”. Due to the length of the pull the wire was split in two sections, therefore a socket pass operation was performed during the pull.


After the pull the equipment was prepared for demobilization by the Bezemer crew, who also operated the equipment during the pull, and shipped back by Saipem to The Netherlands.

Used products in this project

Continuous linear winch CPM 1100

Linear winch type CPM 1100


  • Continuous linear winch CPM 1100 @ PNG - winch at location
  • Continuous linear winch CPM 1100 @ PNG - preparing winch
  • Continuous linear winch CPM 1100 @ PNG - overview
  • foto 4
  • Continuous linear winch CPM 1100 @ PNG - connection buoyancy
  • Continuous linear winch CPM 1100 @ PNG - buoyancy
  • Continuous linear winch CPM 1100 @ PNG - buoyancy
  • Continuous linear winch CPM 1100 @ PNG - buoyancy
  • Continuous linear winch CPM 1100 @ PNG - pipe laying vessel
  • Continuous linear winch CPM 1100 @ PNG - pipe laying vessel
  • Continuous linear winch CPM 1100 @ PNG - pipe laying vessel

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup